Sale!

Pet Running Tracking Leashes Long Lead Large Dog Leash Nylon Rope Dog Mountain Climbing Rope for Medium Large Big Dog FANCHICE

Original price was: $19.92.Current price is: $16.92.

BlueGreenOrangePurpleredRose red
1.5cm wide2.0cm wide2.5cm wide
Clear
SKU: 32999115800 Category:

Description

  • Three sizes:
  • 1.5cm wide * 120cm long
  • 2.0cm wide * 120cm long
  • 2.5cm wide * 120cm long
  • All are sold at a discount!

Additional information

Brand Name

fanchicefanst

Dog Leash Type

Basic Leashes

Pattern

Striped

Season

All seasons

Product Name

New outdoor dog stretch traction rope

Microelastic traction rope

Yes

Pet Products

Leash/Rope/Traction Belt/Traction Rope

Suit

Small Medium Large Dogs

Color

Rad/Green/Bule/Rose/Orange/Purple

Length

120cm

Material

Metal+Nylon

Support Drop Shipping

Yes

Feature

Durable

Type

Classic Style

Pet runnig leash

Pet leash sports/travel/Mountaineering/outdoor

Reviews

There are no reviews yet.

Be the first to review “Pet Running Tracking Leashes Long Lead Large Dog Leash Nylon Rope Dog Mountain Climbing Rope for Medium Large Big Dog FANCHICE”

Your email address will not be published. Required fields are marked *